— Ops Weekly Return

Structured site control return for Operations. Vague one-liners are rejected on sign. Progress needs Block + Elevation/Level + Activity + Measure + Status. Programme dropline PDF is mandatory to sign. Use Prefill from diaries to draft progress / labour / issues from the week's Site Diaries — then confirm before signing. Sections marked Ops Director feed the Ops Directors Weekly Report automatically.

← Site UI Site Diary Forms

Drafts autosave to the VPS a few seconds after you type (and when you leave the tab). You can still use Save draft anytime.

Returns on this project

Week ending PM Package Status RAG
Loading…

Header Ops Director

Use the same week ending across all live projects (Sunday preferred). Numbered sections below match the PDF / HTML view (1–10). RAG + reason feed Project Health and Dashboard exception tiles.

Programme Ops Director

On-track flag and % complete feed Project Health and Ops KPIs (programme). Dropline remains mandatory to sign.

1. Progress this week

Minimum per line: Block + (Elevation or Level) + Activity + Measure (% or qty) + Status. “Block A installing Tyvek” alone will be rejected.

Block / area Elevation Level Activity Measure Status

2. Look ahead Ops Director

Feeds Labour & Forward Look on the Ops Directors Weekly Report.

Activity Works to make ready Need by

3. Delays Ops Director

Feeds Project Health key issues and Risks & Decisions when RAG is Amber/Red.

LocationReason

4. Early warnings

RefDescriptionImpactParty

5. Information required

ItemOwner

6. Critical materials Ops Director

Blocking materials feed Project Health key issues (with procurement RFQ signals).

ItemBlocking which activityETA

7. Labour Ops Director

Week headcount feeds Project Health and Ops KPIs. Four-week gap feeds Labour & Forward Look.

8. H&S Ops Director

Signals feed Ops KPIs (HSQE) on the Ops Directors Weekly Report.

9. Ops Director feed Ops Director

Decisions seed Risks & Decisions. Wins / concerns seed the portfolio Summary on the Ops Directors Weekly Report.

10. Site photos

Pull the week’s diary photos for the MD pack (or add extras). PDF: 1–2 photos print full-page; 3+ print 2-up landscape. Dropline is appended after photos.

Up to 12 photos.

11. Supporting documents

Attach PDFs or Word docs (method statements, correspondence, sketches, etc.). Listed on the weekly PDF; download from this return any time.

PDF, DOC or DOCX — up to 20 files, 25 MB each.